Short-run versus Long-run Decisions
Short run: a period of time during which at least one factor of production remains fixed. In the short run, a firm decides how much output to produce in the current facility.
Long run: the time it takes for a firm to build a production facility and start producing output. In the long run, a firm decides what size and type of facility to build.