The Shut-down Decision
When price drops to $9, the firm adjusts output down to 6 rakes per minute to maintain P=SMC.
- The firm suffers a loss, but since price is greater than average variable cost, the firm continues to operate.
- The average variable cost of producing 6 rakes per minute is $6.